Installation
The VT-01 main unit is normally installed using our VT-01 Mounting-Rack
Wiring:
The VT-01 requires a wiring harness from steering unit to main unit. Its a standard D-SUB Harness. If you purchase our mounting kit, all required connectors and small parts are included.
Besides that you will need a power supply cable. Again its standard D-Sub so you can create an own one or use our finished product VT-0103-2.
In addition to the connectors a data cable is required. We offer a certified datacable at reasonable prices, you can select any required length meter-wise (GAV-4709-0005A)
Typical VT-01 Installation:
– main unit (VT0102)
– control head/steering unit (VT-0101)
– Mounting Rack (VT-0103-1)
– Connection Kit/Power supply cable (VT-0103-2)
– Datacable (GAV-4709-0005A)